Step 6
Parts required:
- 1x Askar 200mm with EAF motor and MXL ring
- 1x MXL timing belt
Slide the belt from the front of the lens and put it onto the MXL pulley.
Now put the rest of the belt onto the 3D printed ring. Work by going through the length of
the belt gradually. Some force should be required.
- if you can put the belt on too easily, there is not enough tenison. Undo the M3
bolts holding the motor in the L bracket and move the motor LOWER. If you are having
trouble accessing the M3 bolts, you can take the focuser off the dovetail by undoing
the 2x M6 16mm bolts.
- if you cant get the belt onto the ring, there is too much tension. Undo the M3 bolts
holding the motor in the L bracket and move the motor HIGHER. If you are having
trouble accessing the M3 bolts, you can take the focuser off the dovetail by undoing
the 2x M6 16mm bolts.